Hand measuring the boiler room - from wall to pipe, from pipe to pipe, floor to ceiling, floor to pipe, etc. One project he recently completed involved a complicated MEP room of a high-rise apartment building in which the domestic water heater needed to be retrofit. THE CHALLENGE Optimize BIM Modeling in Revit for Complex Construction Projects, Reduce Time Spent on Measurements and As-BuiltsĪryn Bergman, lead engineer and founder of TL Circle, is frequently confronted with complex engineering projects requiring days of laborious, time-consuming BIM modeling in Revit, usually from hand-drawn measurements, notes and photographs.